Yantai Funaike Heat Exchanger Co.,Ltd.

Products

Aluminum Plate-bar Radiator

Pavement Construction Machinery

Home>Products>Aluminum Plate-bar Radiator>Pavement Construction Machinery
Land leveller-2187-03-01000

Land leveller-2187-03-01000


Aluminum Plate-bar Heat Exchanger for Road Rolle
  • Feature
  • Parameters

Feature

Aluminum Plate-bar Heat Exchanger for Road Rolle

Parameters

Aluminum Plate-bar Heat Exchanger for Road Roller
Model 2187-03-01000
ParametersCore Size: water 775*700*130mm  intercooler  337*700*130mm   Oil cooler 562*1052*70mm                         
Core Size: 916*1192*505mm                           
Engine:  Weichai(192KW/2200rpm)                                  
Fan:  Blowed                                         
Heat Exchanger:  Water 97KW  intercooler 25KW hydraulic 47KW                                         
Radiator Operation Pressure: 0.2 mpa             
Intercooler Operation Pressure: 0.3mpa               
Hydraulic oil Cooler Operation Pressure:1.6mpa              
Feature /StructurePlate-bar structure with water radiator /intercooler /hydraulic oil structure . 
The advantage is compact structure,surface area can be 1000~2500m/m because of expansion of plate-fin heat exchanger with the quadratic surface.                               
ApplicationApplcaition to Road Roller
AdvantageWith High Efficency of Heat Transfer;Well adapted,Plate-fin heat exchanger can be applied to: gas - gas, gas-liquid and liquid-liquid;Pressure Strength Resistant Capability is high.(Max 4.0Mpa);Low temperature resistant capability is strong(Ambient Tem.-65°C);Fin lodging resistance capability is strong, easy to maintain, flush.
Maintenance 1.Regularly check internal medium quality of heat exchanger,if there is particles、floc matter etc, need exchange in time; 
2.Regularly check outside channel of heat exchanger,if there is any jam,need high pressure air purge;
3. If heat transfer performance fall largely,please stop and check;
4.The vibration of equipment during the operation may cause connection bolt loose. 
Therefore, the connection position should be checked every three months. 
5.The equipment must be operated under design pressure, overpressure operation is forbidden.