Yantai Funaike Heat Exchanger Co.,Ltd.

Products

Aluminum Plate-bar Radiator

Engineer Machinery Series

Home>Products>Aluminum Plate-bar Radiator>Engineer Machinery Series
Excavator-SY55C9

Excavator-SY55C9


Aluminum plate-bar heat exchanger for 
excavator(5.5mt) with advantage high 
efficiency of heat exchanged and high 
pressure strength resistance capability.
  • Feature
  • Parameters

Feature

Aluminum plate-bar heat exchanger for excavator(5.5mt) with advantage 
high efficiency of heat exchanged and high pressure strength resistance capability.

Parameters

Aluminum plate-bar heat exchanger for excavator(5.5mt) with advantage 
high efficiency of heat exchanged and high pressure strength resistance capability.
 ModelSY55C9
ParametersCore Size: 590X520X100mm                               
Core Size: 740X560X300mm                         
Engine: ISUZU(40.9KW/2100rpm)                                  
Fan: Sucked                                        
Heat Exchanger: Water 30KW Oil 14KW                            
Radiator Operation Pressure: 0.2mpa                     
 Oil Cooler Operation Pressure: 1.6mpa              
Feature/structurePlate-bar structure with water radiator /oil cooler structure . 
The advantage is compact structure,surface area can be 1000~2500m/m because of expansion of plate-fin heat exchanger with the quadratic surface.                               
ApplicationApplcaition to excavator 5.5mt 
AdvantageWith High Efficency of Heat Transfer;Well adapted,Plate-fin heat exchanger can be applied to: gas - gas, gas-liquid and liquid-liquid;Pressure Strength Resistant Capability is high.(Max 4.0Mpa);Low temperature resistant capability is strong(Ambient Tem.-65°C);Fin lodging resistance capability is strong, easy to maintain, flush.
Maintenance1.Regularly check internal medium quality of heat exchanger,if there is particles、floc matter etc, need exchange in time; 
2.Regularly check outside channel of heat exchanger,if there is any jam,need high pressure air purge;
3. If heat transfer performance fall largely,please stop and check;
4.The vibration of equipment during the operation may cause connection bolt loose. 
Therefore, the connection position should be checked every three months. 
5.The equipment must be operated under design pressure, overpressure operation is forbidden.