Yantai Funaike Heat Exchanger Co.,Ltd.

Products

Aluminum Plate-bar Radiator

Engineer Machinery Series

Home>Products>Aluminum Plate-bar Radiator>Engineer Machinery Series
Excavator-SY75C9O3-04A

Excavator-SY75C9O3-04A


Aluminum Plate-bar Heat Exchanger for Excavator(7mt)
  • Feature
  • Parameters

Feature

Aluminum Plate-bar Heat Exchanger for Excavator(7mt)

Parameters

Aluminum Plate-bar Heat Exchanger for Excavator(7mt) 
Model SY75C9O3-04A
ParametersCore Size: 610X808X110mm                               
Core Size: 736X808X500mm                         
Engine: ISUZU(38.1KW/2100rpm)                                  
Fan: Sucked                                        
Heat Exchanger: Water 35KW  Oil 20KW  Intercooler 7.5KW                                       
Radiator Operation Pressure:   0.3mpa                      
Oil Cooler Operation Pressure: 2mpa      
Intercooler Operation Pressure : 0.4mpa        
Feature/structurePlate-bar structure with water radiator /oil cooler /intercooler/ fuel oil cooler structure . 
The advantage is compact structure,surface area can be 1000~2500m/m because of expansion of plate-fin heat exchanger with the quadratic surface.                               
ApplicationApplication to excavator 7mt
AdvantageWith High Efficency of Heat Transfer;Well adapted,Plate-fin heat exchanger can be applied to: gas - gas, gas-liquid and liquid-liquid;Pressure Strength Resistant Capability is high.(Max 4.0Mpa);Low temperature resistant capability is strong(Ambient Tem.-65°C);Fin lodging resistance capability is strong, easy to maintain, flush.
Maintenance1.Regularly check internal medium quality of heat exchanger,if there is particles、floc matter etc, need exchange in time; 
2.Regularly check outside channel of heat exchanger,if there is any jam,need high pressure air purge;
3. If heat transfer performance fall largely,please stop and check;
4.The vibration of equipment during the operation may cause connection bolt loose. 
Therefore, the connection position should be checked every three months. 
5.The equipment must be operated under design pressure, overpressure operation is forbidden.